Dec 03 2007 (TRI)

Tata Power Co. Ltd. and ors. Vs. Western Regional Load Despatch

Court: Central Electricity Regulatory Commission CERC

Decided on: Dec-03-2007

..... transmission capacity to the short term customer may be reduced or cancelled by the regional load despatch centre if the central government allocates power from the central generating station or stations ..... person on account of a subsequent request received from such other person ix the regional load despatch centres shall lay down detailed procedure for reservation of transmission capacity to the .....

Tag this Judgment! Ask ChatGPT

Dec 04 2007 (TRI)

Northern Regional Load Despatch Vs. Uttar Pradesh Power Corp. Ltd. and

Court: Central Electricity Regulatory Commission CERC

Decided on: Dec-04-2007

..... in the system must increase the generation and or reduce the load either action would reduce the utilities drawal from the grid or ..... generation should be brought into the grid and harnessed for reducing the load shedding quantum as is presently being tried in pune looked at ..... in procuring power from costlier sources even if it means more load shedding 34 still it is a fact that the grid frequency .....

Tag this Judgment! Ask ChatGPT

Sep 25 2007 (TRI)

Northern Regional Load Despatch Vs. Punjab State Electricity Board

Court: Central Electricity Regulatory Commission CERC

Decided on: Sep-25-2007

..... of ui computation for bbmb stations partner states would enhance the accuracy of their load forecasts and this would further optimize the scheduling of bbmb generation the ultimate objective ..... be released for irrigation purpose hydraulic constraints associated with each power house canal system and load drawal pattern of the states bbmb further submitted that due to interdependence inter linking .....

Tag this Judgment! Ask ChatGPT

Oct 01 2007 (TRI)

Neyveli Liginite Corporation Vs. Tamil Nadu State Load Despatch

Court: Central Electricity Regulatory Commission CERC

Decided on: Oct-01-2007

..... locations and requirement of special energy meters sems 11 all the concerned agencies including state load despatch centers of the concerned states the central power sector utilities and the beneficiaries were .....

Tag this Judgment! Ask ChatGPT

Oct 29 2007 (TRI)

Tata Power Trading Company Ltd. Vs. Western Regional Load Dispatch

Court: Central Electricity Regulatory Commission CERC

Decided on: Oct-29-2007

..... was also representing hubli electric supply company a subsidiary of kptcl and the karnataka state load dispatch centre which is owned and operated by kptcl 4 the counsel for kptcl stated .....

Tag this Judgment! Ask ChatGPT

Oct 12 2007 (TRI)

Ptc India Ltd. Vs. Northern Regional Load Despatch

Court: Central Electricity Regulatory Commission CERC

Decided on: Oct-12-2007

1 the petitioner has made this application under regulation 35 of the central electricity regulatory commission open access in inter...

Tag this Judgment! Ask ChatGPT

Jun 06 2007 (TRI)

Shree Dhanvarsha Steels (Pvt.) Vs. Uttaranchal Electricity

Court: Appellate Tribunal for Electricity APTEL

Decided on: Jun-06-2007

Reported in: (2007)LCAPTEL1341

..... the requirement of existing steel units based on their contracted load and the load factor for the group accordingly their consumption for 2006 07 ..... ht industries and steel units on the ground that the load factor for ht industries and steel units were so different ..... industries and steel units respectively the commission claims that the load factors for these two groups have been calculated from the .....

Tag this Judgment! Ask ChatGPT

Dec 19 2007 (TRI)

Spencer'S Retail Ltd. Vs. Maharastra Electricity

Court: Appellate Tribunal for Electricity APTEL

Decided on: Dec-19-2007

..... such as asc recovery from specified class of consumers and a protocol of planned load shedding and its enforcement across the state disincentivizing luxurious wasteful non critical consumption by ..... securing equitable distribution of electricity and promoting competition it needs to be emphasized that load management charges need to be applied equitably on all category of consumers neyveli lignite .....

Tag this Judgment! Ask ChatGPT

Jul 30 2007 (TRI)

Jharkhand Induction Furnace Vs. Jharkhand State Electricity

Court: Appellate Tribunal for Electricity APTEL

Decided on: Jul-30-2007

Reported in: (2007)LCAPTEL1241

..... at 132 kv 7 5 table 5 38 load factor rebate for ht consumers load factor load factor rebate 40 60 5 60 70 ..... tariff order applicable from 1st january 2004 the commission introduced a load factor rebate for all industrial consumers the portion relevant of ..... 24th august 2006 was addressed to the commission seeking clarification regarding load factor rebate the commission replied by the letter dated 25th .....

Tag this Judgment! Ask ChatGPT

May 04 2007 (HC)

Union of India (Uoi) and ors. Vs. Durmesh Coal and ors.

Court: Guwahati

Decided on: May-04-2007

..... of its business coal through railway wagons at times railway wagons loaded with coal are found to be carrying weight in excess ..... may be transferred from being overloading to the wagons having less load by the petitioner that shall be completed within the time ..... discussion is that the railways have the power to carry excess load to its destination and recover punitive charges as indicated hereinabove .....

Tag this Judgment! Ask ChatGPT

  • << Prev.