IN THE HIGH COURT OF KERALA AT ERNAKULAM
PRESENT THE HONOURABLE MR. JUSTICE GOPINATH P. TUESDAY, THE 9TH DAY OF APRIL 2024 / 20TH CHAITHRA, 1946 RP NO. 431 OF 2024 AGAINST THE JUDGMENT DATED IN WP(C) NO.27392 OF 2015 OF HIGH COURT OF KERALA REVIEW PETITIONER/PETITIONER: RAHUL KRISHNAN, AGED 43 YEARS S/O. T.N.RADHAKRISHNA PILLAI, SWAGATH ORGANIC FARM TRADING, EDAPPON, NOORANAD, IRANIKKUZHI PO, CHENGANNUR, ALAPPUZHA DISTRICT, PIN - BY ADVS. G.HARIHARAN PRAVEEN.H. K.S.SMITHA B.R.SINDU V.R.SANJEEV KUMAR V.ROHITH AFNA V.P. RESPONDENTS/RESPONDENTS:
1 THE ELECTRICAL INSPECTOR ELECTRICAL INSPECTORATE DEPARTMENT, OFFICE OF THE DISTRICT ELECTRICAL INSPECTOR, THIRUMALA DEVASWOM BOARD BUILDINGS 2 THE ASSISTANT ENGINEER, LINE MAINTENANCE SECTION, EDAPPON, PATTOOR PO, ALAPPUZHA, PIN - 689501 3 THE DEPUTY CHIEF ENGINEER, TRANSMISSION CIRCLE, 4 THE EXECUTIVE ENGINEER TRANSMISSION DIVISION, MAVELIKKARA., ALAPPUZHA DISTRICT, PIN - 690101 5 THE ASSISTANT EXECUTIVE ENGINEER, TRANSMISSION SUB DIVISION, EDAPPON, ALAPPUZHA DISTRICT, PIN - 689501
OTHER PRESENT: SRI.BINOY DAVIS (GP) SRI B PREMOD, SC KSEB THIS REVIEW PETITION HAVING COME UP FOR ADMISSION ON 09.04.2024, THE COURT ON THE SAME DAY DELIVERED THE FOLLOWING:
GOPINATH P., J.
------------------------------------------ R.P.No.431 of 2024 in W.P(C).No.27392 of 2015 ------------------------------------- Dated this the 9th day of April, 2024
ORDER
The contention of the petitioner in the review petition appears to be that, if the existing towers supporting the tower line passing over the cattle shed of the petitioner is supported by another tower by maintaining the distance specified in the technical specification for steel pole structure installations in India, the sagging of the tower lines between the existing tower lines can be avoided and the aerial distance can be maintained. This contention, in my view, does not constitute a ground for review. The Review Petition fails and is accordingly dismissed. Sd/- GOPINATH P, JUDGE Sbna/ APPENDIX OF RP 431/2024 PETITIONER ANNEXURES Annexure I A TRUE COPY OF THE INTERIM ORDER DATED 10.09.2015 MADE IN W.P.(C).NO.27392/2015 Annexure II A TRUE COPY OF THE RELEVANT EXTRACT OF THE REGULATION 63 OF THE CEA MEASURES RELATING TO SAFETY AND ELECTRIC SUPPLY REGULATIONS, 2010 Annexure III . A TRUE COPY OF THE PHOTOGRAPH OF THE AERIAL VIEW OF THE TOWER LINE AS WELL AS THE CATTLE SHED ERECTED IN THE PETITIONER'S PROPERTY Annexure IV A TRUE COPY OF THE NOTICE DATED 29.02.2024 ISSUED BY THE 5TH RESPONDENT ADDRESSED TO THE PETITIONER