General Conditions For The Supply Of Plant And Machinery For Export Foreign Collaboration & Joint Venture 1299 Legal Draft Template
| Category | Foreign Collaboration And Joint Venture |
| Format | Rich Text |
| File name | GENERAL CONDITIONS FOR THE SUPPLY OF PLANT AND MACHINERY FOR EXPORT-Foreign Collaboration & Joint Venture-1299.rtf |
Effortlessly craft professional legal documents with 500+ industry-standard templates and refine them using DraftPilot - your AI drafting copilot. Seamlessly upload, review, and compare multiple existing drafts side-by-side.
DraftPilot - GPT-powered editing under LegalDraft Studio · also part of your AI Studio plan Browse & download templates free - DraftPilot requires login + AI Studio
Industry-standard template for reference. Adapt it with DraftPilot (AI copilot), compare clause-by-clause in our comparison workspace, or download and edit offline. Consult a qualified advocate before filing or execution.
Draft Preview
UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE
GENEVA, MARCH, 1953
2.2 If the Vendor, in drawing up his tender, has fixed a time-limit for acceptance, the Contract shall be deemed to have been entered into when the Purchaser has sent an acceptance in writing before the expiration of such time-limit, provided that there shall be not binding Contract unless the acceptance reaches the Vendor not later than one week after the expiration of such time-limit.
3.1 The weights, dimensions, capacities, prices, performance ratings and other data included in catalogues, prospectuses, circulars, advertisements, illustrated matter and price lists constitute an approximate guide. These data shall not be binding save to the extent that they are by reference expressly included in the Contract.
3.2 Any drawings or technical documents intended, for use in the construction of the Plant or of part thereof and submitted to the Purchaser prior or subsequent to the formation of the Contract remain the exclusive property of the Vendor. They may not, without the Vendor’s consent, be utilised by the Purchaser or copied, reproduced, transmitted or communicated to a third party. Provided, however, that the said plants and documents shall be the property of the Purchaser;
(b) if they are referable to a separate preliminary Development Contract on which no actual construction was to be performed and in which the property of the Vendor in the said plans and documents was not reserved.
3.3 Any drawings or technical documents intended for use in the construction of the Plant or of part thereof and submitted to the Vendor by the Purchaser prior or subsequently to the formation of the Contract remain the exclusive property of the Purchaser. They may not, without his consent, be utilised by the Vendor, or copied, reproduced, transmitted or communicated to a third party.
3.4 The vendor shall, if required by the Purchaser, furnish free of charge to the Purchaser at the commencement of the Guarantee period, as defined in Clause 9, information and drawings other than manufacturing drawings of the Plant of sufficient detail to enable the Purchaser to carry out the erection, commissioning, operation and maintenance (including running repairs) of all parts of the Plant. Such information and drawing shall be the property of the Purchaser and the restrictions on their use set out in paragraph 2 hereof shall not apply thereto. Provided that if the vendor so stipulates, they shall remain confidential.
4.1 Unless otherwise specified :
6. Passing or risk
6.2 In the case of a sale “ex-works’, the Vendor must give notice in writing to the Purchaser of the date on which the Purchaser must take delivery of the Plant. The notice of the Vendor must be given in sufficient time to allow the Purchaser to take such measures as are normally necessary for purpose of taking delivery.
(c) the date of the receipt by the Vendor of such payment in advance of manufacture as is stipulated in the Contract.
7.2 Should delay in delivery be caused by any of the circumstances mentioned in Clauses 10 or by an act or omission of the Purchaser and whether such cause occurs before or after the time or extended time for delivery, there shall be granted subject to the provisions of paragraph 5 hereof such extension of the delivery period as is reasonable having regard to all circumstances of the case.
7.4 If the time for delivery mentioned in the Contract is an estimate only, either party may after the expiration of two thirds of such estimated time require the other party in writing to agree a fixed time.
Where no time for delivery is mentioned in the Contract, this course shall be open to either party after the expiration of six months from the formation of the Contract.
7.5 If any portion of the Plant is respect of which the Purchaser has become entitled to the maximum reduction provided for by paragraph 3 hereof, or in respect of which he would have been so entitled had he given the notice referred to therein, remains undelivered, the Purchaser many by notice in writing to the Vendor require him to deliver and by such last mentioned notice fix a final time for delivery which shall be reasonable, taking into account such delay as has already occurred. If for any reason whatever the Vendor fails within such time to do everything that he must do to effect delivery the Purchaser shall be entitled by notice in writing to the Vendor and without requiring the consent of any Court, to terminate the Contract in respect of such portion of the Plant and thereupon to recover from the Vendor any loss suffered by the Purchaser by reason of the failure of the Vendor as aforesaid up to an amount not exceeding the sum named in paragraph C of the Appendix or, if no sum be named, that part of the price payable under the Contract which is properly attributable to such portion of the Plant as could not in consequence of the Vendor’s failure be put to the use intended.
7.6 If the Purchaser fails to accept delivery on due date, he shall nevertheless make any payment conditional on delivery as if the Plant had been delivered. The Vendor shall arrange for the storage of the Plant at the risk and cost of the Purchaser. Provided that is the delay in accepting delivery is due to one of the circumstances mentioned in Clauses 10 and the Vendor is in a position to store it in his premises without prejudice to his business, the cost of storing the Plant shall not be borne by the Purchaser.
7.7 Unless the failure of the Purchaser is due to any of the circumstances mentioned in Clause 10, the Vendor may require Purchaser by notice in Writing to accept delivery within a reasonable time.
If the Purchaser fails for any reason whatsoever to do so within time the Vendor shall be entitled by notice in writing to the Purchaser and without requiring the consent of any Court, to terminate the Contract in respect of such portion of the Plant as is by reason of such failure up to an amount not exceeding the sum named in paragraph D of the Appendix or, if no sum be named, that part of the price payable under the Contract which is properly attributable to such portion of the Plant.
8.2 Any advance payments made by the Purchaser are payments on account and do not constitute a deposit, the abandonment of which would entitle either party to terminate the Contract.
8.3 If delivery has been made before payment of the whole sum payable under the Contract, Plant delivered shall to the extent permitted by the law of the country where the Plant is situated after delivery remain the property of the Vendor until such payment has been effected. If such law does not permit the Vendor to retain the property in the Plant, the Vendor shall be entitled to the benefit of such other rights in respect thereof as such law permits him to retain. The Purchaser shall give the Vendor every assistance in taking any measures required to protect the Vendor’s right of property or such other rights as aforesaid.
8.4 A payment conditional on the fulfilment of an obligation by the Vendor shall not be due until such obligation has been fulfilled unless the failure of the Vendor is due to an act or omission of the Purchaser.
8.5 If the Purchaser delays in making any payment the Vendor may postpone the fulfillment of his own obligations until such payment is made unless the failure of the Purchaser is due to an act or omission of the Vendor.
8.6 If delay by the Purchaser in making any payment is due to one of the circumstances mentioned in Clause 10, the Vendor shall not be entitled to any interest on the sum due.
9.2 This liability is limited to defects which appear during the period (hereinafter called “the Guarantee Period”) specified in paragraph C of Appendix.
9.3 In fixing this period due account has been taken of the time normally required for transport as contemplated in the Contract.
9.4 In respect of such parts (whether of the Vendor’s own manufacture or not) of the Plant as are expressly mentioned in the Contract, the Guarantee Period shall be such other period (if any) as is specified in respect of each of such parts.
9.5 The Guarantee Period shall start from the date on which the Purchaser receives notification in writing from the Vendor that the Plant is ready for dispatch from the works. If dispatch is delayed, the Guarantee Period shall be extended by a period equivalent to the amount of the delay so as to permit the Purchaser the full benefit of the time given for trying out the Plant. Provided however that if such delay is due to a cause beyond the control of the Vendor such extension shall not exceed the number of months stated in paragraph 11 of the Appendix.
9.6 The daily use of the Plant and the amount by which the Guarantee period shall be reduced if the Plant is used more intensively are sated in paragraph 1 of the Appendix.
9.7 A fresh Guarantee Period equal to that stated in paragraph G of the Appendix shall apply, under the same terms and conditions as those applicable to the original Plant, to parts supplied in replacement of defective parts renewed in pursuance of this clause. This provision shall not apply to the remaining parts of the Plant , the Guarantee Period of which shall be extended only by a period equal to the period during which the Plant is out of actions as a result of a defect covered by this Clause.
9.8 In order to be able to avail himself of his rights under this clause the Purchaser shall notify the Vendor in writing without delay of and defects that have appeared and shall give him every opportunity of inspecting and remedying them.
9.9 On receipt of such notification the Vendor shall remedy the defect forthwith and, save as mentioned in paragraph 10 hereof, at his own expense. Save where the nature of the defect is such that it is appropriate to effect repairs on site, the purchaser shall return to the Vendor any part in which a defect covered by this Clause has appeared, for repair or replacement by the Vendor, and in such case the delivery to the Purchaser of such part properly repaired or a part in replacement thereof shall be deemed to be a fulfilment by the Vendor of his obligations under this paragraph in respect of such defective part.
9.11 Where in pursuance of paragraph 9 hereof, repairs are required to be effected on site, the conditions covering the attendance of the Vendor’s representatives on site shall be such as may be specially agreed between the parties.
9.14 The Vendor’s liability does not apply to defects arising out of materials provided, or out of a design stipulated, by the Purchaser.
9.15 The Vendor’s liability shall apply only to defects that appear under the conditions of operation provided for by the Contract and under proper use. It does not cover defects due to causes arising after the risk in the Plant has passed in accordance with Calsue6. In particular it does not cover defects arising from the Purchaser’s faulty maintenance or erection or from alterations carried out without the Vendor’s consent in writing, or from repairs carried out improperly by the Purchaser, nor does it cover normal deterioration.
9.16 Save as in this Clause expressed, the Vendor shall be under no liability in respect of defects after the risk in the Plant has passed in accordance with Clause 6, even if such defects are due to causes existing before the risk so passed. It is expressly agreed that the Purchaser shall have no claim in respect, of personal injury or of damages to property not the subject-matter of the Contract or of loss or profit unless it is shown from the circumstances of the case that the Vendor has been guilty of gross misconduct.
9.17 “Gross Misconduct” does not comprise any and every lack or proper care of skill, but means and act or omission on the part of the Vendor implying either a failure to pay due regard to serous consequences which a conscientious Contractor would normally foresee as likely to ensure, or a deliberate disregard of any consequences of such act or omission.
10.1 The following shall be considered as cases of relief if they intervene after the formation of the Contract and impede its performance :Industrial disputes and any other circumstances (e.g. fire, mobilization, requisition, embargo, currency restrictions, insurrection, shortage of materials and restrictions, insurrection, shortage of transport, general shortage of materials and restrictions in the use of power) when such other circumstances are beyond the control of the parties.
10.2 The party wishing to claim relief by reason of any of the said circumstances shall notify the other party in writing without delay on the intervention and on the cessation thereof.
10.3 The effects of the said circumstances, so far as they affect the timely performance of their obligations by the parties, are defined in Clauses 7 and 8. Save as provided in Paragraph 7.5,7.7 and 8.7., if by reason of any of the said circumstances, the performance of the Contract within a reasonable time becomes impossible, either party shall be entitled to terminate the contract.
10.4 If the Contract is terminated in accordance with paragraph 3 hereof, the division of the expenses incurred in respect of the Contract shall be determined by agreement between the parties.
10.5 In default of agreement it shall be determined by the arbitrator which party has been prevented from performing his obligations and the party shall bear the whole of the said expenses. Where the Purchaser is required to bear the whole of the expenses and has before termination of the Contract paid to the Vendor more than the Vendor’s expenses, the Purchaser shall be entitled to recover the excess.
If the arbitrator determines that both parties have been prevented from performing their obligations, he shall apportion the said expenses between the parties in such manner as to him seem fair and reasonable, having regard to all the circumstances of the case.
10.6 For the purposes of this Clause “expenses” means actual out-of-pocket expenses reasonably incurred, after both parties shall have mitigated their losses as far as possible. Provided that as respects Plant delivered to the Purchase the Vendor’s expenses shall be deemed to be that part of the price payable under the Contract which is properly attributable thereto.
11.1 Whether either party is liable in damages to the other these shall not exceed the damage which the party in default could reasonably have foreseen at the time of the formation of the Contract.
11.2 The party who sets up a breach of the Contract shall be under a duty to take all necessary measures to mitigate the loss which has occurred provided that he can do so without unreasonable inconvenience, or cost. Should he fail to do so, the party guilty of the breach may claim a reduction in the damages.
13.2 Unless otherwise agreed, the Contract shall be governed by law of the Vendor’s country.
13.3 If the parties expressly so agree, but not otherwise, the arbitrators shall, in giving their ruling, act as amiable compositors.
A. Percentage to be deducted for each week’s delay 7.3…..per cent
B. Maximum percentage which the deductions above 7.3…. per cent
E. Rate of interest on overdue payments 8.7……per cent
Per annum
F. Period of delay in payment authorising 8.7…..months
Parts replaced or renewed 9.5……..months
H. Maximum extension of guarantee period 9.6…….hours/day
(1) Daily use of Plant
(2) Reduction of Guarantee period 9.6…………….
for more intensive use.