Skip to content

Did you mean: sale deed?


Phase Meter - Judgment Search Results

Home > Cases Phrase: phase meter Page 1 of about 1,230 results (0.646 seconds)
Aug 09 2006 (HC)

Durga Rice Mill, Rep. by Its Managing Partner Anusuri Veerraju Vs. And ...

Court: Andhra Pradesh

Reported in: 2006(6)ALD398

..... supervised the installation work checked and fixed a three phased meter and seals on the meter and box on 05 05 1984 qualified employees of ..... it was found that one phase out of the three phases was not working and the meter was running two phases only the supreme court held ..... the assistant engineer of the electricity board was that one phase of the meter was not working at all and hence that dispute has .....

Tag this Judgment! Ask ChatGPT

Jan 15 1991 (HC)

Vxl India Limited and anr. Vs. Maharashtra State Electricity Board and ...

Court: Mumbai

Reported in: 1991(3)BomCR184

..... joka west bengal they have quoted two rates for single phase meters viz a single phase meters as per tender specification rs 235 b single phase meters generally in line with tender specifications and relevant clause ..... tender the respondent no 3 stated that it would supply 20 000 single phase meters and 5 000 three phase meters per month or 20 per month of the ordered quantity whichever was less .....

Tag this Judgment! Ask ChatGPT

Dec 14 2005 (HC)

Suresh Jindal Vs. Bses Rajdhani Power Ltd.

Court: Delhi

Reported in: 126(2006)DLT49

..... be indelibly marked with a diagram of connections for poly phase meters this diagram shall also show the phase sequence for which the meter is intended it is permissible to indicate the connection diagram ..... in october 2003 then in october 2004 and finally in december 2004 specifications of single phase electronic meters were notified by bids vide is no 13779 1ec 1036 17 amendment incorporated in .....

Tag this Judgment! Ask ChatGPT

Sep 28 2005 (HC)

Manoj Rajani Vs. Superintending Engineer, M.P.E.B. and anr.

Court: Madhya Pradesh

Reported in: AIR2006MP100

..... was stopped and on all the phases load found were 2 0 0 5 0 5 and meter of phase of 20 ampere load was stopped ..... phase were running fast and meter of third phase was running slow it is also mentioned in column no 15 regarding details of irregularities found in the premises of consumer that at first phase meter .....

Tag this Judgment! Ask ChatGPT

Jan 31 2011 (HC)

M/S Lands + Gyr Limited Vs. the General Manager (Ele), Bangalore Elect ...

Court: Karnataka

..... of the technical specifications of tender documents for lt single phase meter principally there are three clauses under tests namely 11 ..... of the technical specifications of tender documents for lt single phase meter principally there are three clauses under tests namely 11 ..... 2009 had informed the first respondent that the sample single phase meters supplied by the third respondent did not comply with .....

Tag this Judgment! Ask ChatGPT

Oct 31 2012 (TRI)

Asst.Executive Engineer Electrical Section, Kseb Kottackal, Malappuram ...

Court: Kerala State Consumer Disputes Redressal Commission SCDRC Thiruvananthapuram

..... 1 9 06 on inspection it was found that only two phases of the three phase meter were recording consumption the other phase was not recording consumption since copper compounds were deposited cutting off ..... electrical section on inspection it was found that only two phases of the 3 phase meter were recording consumption on calibration the meter showed percentage of error as 33 14 the complainant was .....

Tag this Judgment! Ask ChatGPT

Apr 19 2013 (TRI)

The Assistant Engineer, Electrical Section, Kseb and Others Vs. the Se ...

Court: Kerala State Consumer Disputes Redressal Commission SCDRC Thiruvananthapuram

..... changed due to non recording of consumption in 2 phases of the 3 phase meter and it was corroborated by exbt b1 meter reading register he also pointed out that the failure to refer ..... a bill for rs 55 941 was issued on the ground that 2 phases of the 3 phase energy meter was not recording the consumption it is also stated in the complaint that .....

Tag this Judgment! Ask ChatGPT

Jul 24 2019 (HC)

Bses Yamuna Power Ltd. Vs.ashok Kumar

Court: Delhi

..... stop or run slow such as reversing the polarity of one phase of poly phase meters changes in ct or pt etc rfa12011 page 7 of 14 25 procedure for booking ..... 2006 when the following salient observations were made on the meter number 17034569 three phase whole current electronic meter three phase whole current electronic meter total connected land of the premises found the 33 528 .....

Tag this Judgment! Ask ChatGPT

Jul 11 2003 (HC)

Daljit Kaur Jaggi Vs. Mumbai Suburban Electricity Supply Ltd. and ors.

Court: Mumbai

Reported in: 2003(4)ALLMR529; 2004(1)BomCR745

..... the bills for the period prior to december 1997 and after the installation of three phase meter were issued on the basis of average reading of 1938 units per month with specific ..... that even in the month of april 1996 immediately after the installation of new meter consequent to three phase connection being provided for the bills were issued solely on the average consumption .....

Tag this Judgment! Ask ChatGPT

Oct 05 2009 (TRI)

The Secretary K.S.E.B., Pattom, Thiruvananthapuram and Others Vs. K.J. ...

Court: Kerala State Consumer Disputes Redressal Commission SCDRC Thiruvananthapuram

..... in the said inspection unauthorized connected load of 15kw was detected and that one phase of the three phase meter was not recording the actual consumption of energy thus the opposite parties justified ..... site mahasar he argued for the position that there was no recording of one phase of the energy meter and thereby the complainant consumer has not been charged for the entire energy .....

Tag this Judgment! Ask ChatGPT

  • << Prev.

Sign-up to get more results

Unlock complete result pages and premium legal research features.

Start Free Trial

Save Judgments// Add Notes // Store Search Result sets // Organize Client Files //