Aug 14 2002 (HC)

Associated Cement Co. Ltd. Vs. Bihar State Electricity Board and ors.

Court: Jharkhand

Decided on: Aug-14-2002

Reported in: AIR2003Jhar1; 2003(51)BLJR155

..... due to petitioner availing energy from its own generating set no claim for reduction existing maximum demand shall be entertained since supply of electrical energy by the board to the appellant did ..... energy generating from their own generating sets the claim of the appellant for reduction of maximum demand was therefore not bona fide and was invalid 4 learned single judge after considering the .....

Tag this Judgment! Ask ChatGPT

Mar 05 2002 (HC)

Hindustan Petroleum Corporation Vs. Managing Director, Cesco and ors.

Court: Orissa

Decided on: Mar-05-2002

Reported in: AIR2002Ori137

..... 16 3 1994 the premises were energized with electricity and tile maximum demand was contracted to be 225 kva on the basis of the installed capacity the petitioner ..... prescribed voltage under para b below b the monthly charges shall be demand charges at rs 65 per kva of maximum demand or 80 per cent of contract demand whichever is higher plus energy charges at the following rate on units metered .....

Tag this Judgment! Ask ChatGPT

Feb 22 2002 (HC)

Management of Engine Valves Ltd. Vs. Presiding Officer, First Addition ...

Court: Chennai

Decided on: Feb-22-2002

Reported in: (2002)IIILLJ57Mad

..... work they committed some mischief in the electricity service connection and thereby they opened the maximum demand meter mdm and snapped the connection wire this was found on december 30 1986 ..... company committed theft of electricity and the management was guilty of such malpractices whereby the maximum demand meter had been tampered with therefore it cannot be said that only the second respondent .....

Tag this Judgment! Ask ChatGPT

Aug 13 2002 (HC)

Mcnally Bharat Engineering Company Ltd. Vs. Jharkhand State Electricit ...

Court: Jharkhand

Decided on: Aug-13-2002

Reported in: 2003(3)BLJR2177

..... the time of the request less than twice the maximum demand asked for by any such person or iii the licensee is unable ..... supply was required was less than twice the maximum demand asked for by any such person or ii the maximum demand of the licensee being a distributing licensee and ..... sufficient work order so it did not require contract demand of 1000 kva which has been informed to the electrical superintending .....

Tag this Judgment! Ask ChatGPT

Sep 23 2002 (HC)

Ambeshwar Paper Mills Ltd. Vs. Gujarat Electricity Board and ors.

Court: Gujarat

Decided on: Sep-23-2002

Reported in: AIR2003Guj118; (2003)2GLR1500

..... certain events when the plants were running on full load capacity maximum demand recorded in the meter is substantially lower than average actual consumption ..... the conditions of supply the parameter m will be contract demand in kw or 75 of the connected load in kw whichever is higher ..... is also submitted by mr mehta that the monthly kva demand recorded during the last few years never crossed 1500 kva which justify the .....

Tag this Judgment! Ask ChatGPT

Jun 06 2002 (HC)

Nava Bharat Ferro Alloys Limited and Raasi Cement Limited Vs. A.P. Sta ...

Court: Andhra Pradesh

Decided on: Jun-06-2002

Reported in: AIR2002AP493; 2002(4)ALD34; 2002(5)ALT530

..... cement and it is a ht consumer with a contracted maximum demand of 32 mva under an agreement with the board the ..... petitioner is under an obligation to pay the board the maximum demand charges energy charges meter rent and other charges in accordance ..... the appellant kanoria chemicals and industries limited questioning the notices demanding late payment surcharge under clause 7 b the main contention .....

Tag this Judgment! Ask ChatGPT

Apr 02 2002 (HC)

R.V.K. Energy Pvt. Ltd., Hyderabad Vs. A.P.S.E.B., Hyderabad and anr.

Court: Andhra Pradesh

Decided on: Apr-02-2002

Reported in: 2002(3)ALD196; 2002(2)ALT439

..... as mentioned in this approval letter 7 the total contracts maximum demand of the identified consumers with the generating company shall not ..... 8 the generating company shall keep their generation at its maximum rating during peaking hours of the day as declared by ..... 2 prospective investors and entrepreneurs based on their study of demand conditions and after finalising negotiations with end consumers of .....

Tag this Judgment! Ask ChatGPT

Feb 27 2002 (HC)

S.R. Apna Cold Storage and Ice Factory and anr. Vs. U.P. State Electri ...

Court: Allahabad

Decided on: Feb-27-2002

Reported in: 2002(2)AWC1182

..... electricity distribution division hathras aligarh wherein it is averred that the maximum demand raised by the petitioners from time to time showed that ..... period i e from may 1991 to october 1995 the maximum demand raised by the petitioners very often exceeded 95 b h ..... for the load to remain connected under the reduced contracted demand shall be furnished by the consumer for purposes of record .....

Tag this Judgment! Ask ChatGPT

Aug 01 2002 (HC)

Modern Terry Towels Ltd. Vs. Gujarat Electricity Board and ors.

Court: Gujarat

Decided on: Aug-01-2002

Reported in: AIR2003Guj63; (2003)4GLR354

..... in the supply within the prescribed limits of error and a maximum demand indicator or other apparatus referred to in sub section 7 shall ..... or more seals to any cut out and to any meter maximum demand indicator or the apparatus placed upon a consumer s premises in ..... the board having ht consumer no 17263 the petitioner s contracted demand is 2400 kva the petitioner is provided with special electric meter .....

Tag this Judgment! Ask ChatGPT

Dec 20 2002 (HC)

Pushya Industrial Gases Ltd. Rep. by Its Managing Director V. Murali V ...

Court: Chennai

Decided on: Dec-20-2002

Reported in: AIR2003Mad317

..... respect of high tension service connections where the meter fixed for measuring the maximum demand becomes defective the maximum demand will be assessed by computation on the basis of the average of the ..... recorded demand during the previous four months when the meter becomes defective immediately after .....

Tag this Judgment! Ask ChatGPT

  • << Prev.

Sign-up to get more results

Unlock complete result pages and premium legal research features.

Start Free Trial

Save Judgments// Add Notes // Store Search Result sets // Organize Client Files //