The boiling of catechu logs, manufacture of cutch and other process for the manufacture of cutch shall be carried on only in such places and within such time as may be specified by the1[Deputy Conservator of Forest]
______________________
1. Substituted by Act 20 of 2001 w.e.f. 5.9.2002.