Skip to content


Judgment Search Results Home > Cases Phrase: payment and settlement systems act 2007 section 16 power to carry out audit and inspection Court: national green tribunal principal bench new delhi Page 1 of about 1 results (0.616 seconds)

Dec 14 2011 (TRI)

Jaya Prakash Dabral Vs. Ministry of Environment and Forests and Others

Court : National Green Tribunal Principal Bench New Delhi

..... . the person injured per-se as occurred in section 18 (2) of the ngt act is only for the purpose of claiming relief, compensation or settlement of disputes, is altogether different from the person aggrieved as available in section 16. person aggrieved and person injured are two different words which connote different meaning ..... the person, the owner, the legal representative, agent, representative body or organization shall not be entitled to make an application for grant of relief or compensation or settlement of dispute if such person, the owner, the legal representative, agent, representative body or organization have preferred an appeal under section 16. (3) the application, ..... time being in force: provided that where all the legal representatives of the deceased have not joined in any such application for compensation or relief or settlement of dispute, the application shall be made on behalf of, or, for the benefit of all the legal representatives of the deceased and the legal .....

Tag this Judgment!

Dec 14 2011 (TRI)

Vimal Bhai and Others Vs. Ministry of Environment and Forests Through ...

Court : National Green Tribunal Principal Bench New Delhi

..... person, the owner, the legal representative, agent, representative body or organization shall not be entitled to make an application for grant of relief or compensation or settlement of dispute if such person, the owner, the legal representative, agent, representative body or organization have preferred an appeal under section 16. (3) the ..... submitted its report containing following major recommendations: (a) minimum natural water flow (i.e. ecological water flow) should be maintained for continuity of aquatic eco-system of river ganga. this may be decided by the national ganga river basin authority (ngrba for short), constituted in february 2009. however, till time it ..... small, medium and large similar projects are on various stages of formulation, there is potential for irreparable and irreversible damage to the entire riverine eco-system in the future. the fac therefore, recommended that no further projects of this nature can be considered by the fac, without a comprehensive study .....

Tag this Judgment!

May 28 2014 (TRI)

Sreeranganathan K.P., Sreepadam Vadakkkekkottaram (H) and Others Vs. t ...

Court : National Green Tribunal Principal Bench New Delhi

..... and financial outlay, landscape plan, green belts and open spaces, and a thick green belt has been planned all around the nearest settlement to mitigate noise and vibration etc., if any, (vi) examining and submitting the details of noise modeling studies and mitigative measures, ..... recognized and accepted methodology of eia, scope of eia, study period, study period, air environment, noise environment, water environment, land environment, eco-system, socio-economic development, project description, disaster management plan, basic infrastructure required, existing environmental status, ambient air quality, noise environment, water quality, ..... india pvt., ltd., covered the methodology of eia, scope of eia, study period, air environment, noise environment, water environment, land environment, eco-system, socio-economic development, project description, disaster management plan, basic infrastructure required, existing environmental status, ambient air quality, noise environment, water quality, .....