Skip to content


Judgment Search Results Home > Cases Phrase: capacitor Court: chennai Page 1 of about 48 results (0.032 seconds)

Jan 08 2013 (HC)

Misha Power Pvt Ltd Vs. Tangedco Ltd

Court : Chennai

..... since the project is for a term of 7 years and the technical and commercial bid had to encompass every possible aspect for the entire term and to ensure the capacitors met the specifications, two days were insufficient, leaving no doubt that the second corrigendum and the clarifications were issued at the nick of time to ensure that the tender would go to the participating bidders favoured by ..... the petitioner has stated in the affidavit filed along with this writ petition that most of the capacitors are used for improvement of power factor through some sensing relay and this sensing relay along with other control elements only has been given in the clarification ..... the petitioner himself under para 1 page 103 of the petition has stated that most of the capacitors are used for improvement of power factor through some sensing relay and this sensing relay along with other control elements only has been given in the ..... moreover in technical specification cl.5.2 it has been stated that the capacitor rating table provides a conceptual design of the kvar assigned for the capacitors within each stage for the application, however, the bidder may propose alternate confirguration of kvar assigned to various stages but the total kvar capacity should be the same as in the ..... , due to the modification, the petitioner was put to distress and was forced to search for a consortium partner having expertise in dynamic capacitor panels at a short span of time which is ideally a time consuming process. .....

Tag this Judgment!

May 05 2011 (TRI)

M/S. Vijayakumar Forgings, Rep. by Its Proprietor R.Ramanathan Vs. N. ...

Court : Tamil Nadu State Consumer Disputes Redressal Commission SCDRC Chennai

..... 2007, based upon the pleadings, as well as the proof affidavit, supported by documents, while evaluating the matter, has come to the conclusion that the complainant has not proved that the capacitor was not functioning properly, by producing the log book, which should be the best evidence and in this view, find fault with the complainant, that he has not made out a ..... complainant will not come within the meaning of consumer, resisted the complaint, inter alia contending further that only at the request of the complainant, the opposite party provided an automatic relay/capacitor, which was installed, functioning properly, for which, log book is maintained, that the system should always be switched on, in order to obtain the best results, but unfortunately, the ..... complainants company closed/shut down, resulting switching off of the relay/capacitor, consequentially not functioning properly, for which, the opposite party cannot be held responsible, for the improper usage of the system by the complainant, that after fully satisfied about the functioning ..... of the complaint, it is said, on 27.5.2004, the opposite party promised and assured to supply and erect the relay/capacitor, received advance, later on, it was agreed between the parties to supply automatic relay/capacitor and this being the position, it is not known, how the opposite party could be held responsible, for the penalty .....

Tag this Judgment!

Jun 02 2016 (HC)

M/s.A.S. Enterprises Vs. The Commissioner of Customs, Chennai and Othe ...

Court : Chennai

..... accordingly, i direct the respondents to release the imported goods led spare parts for lighting fixtures, spare parts for lighting fixtures and capacitor for lighting fixtures covered under the bill of entry dated 15.04.2015 to the petitioner within one week from the date of receipt of a copy of this order. 19. ..... , led spare parts for lighting fixtures, spare parts for lighting fixtures and capacitor for lighting fixtures covered under the bill of entry dated 15.04.2015 in terms of section 110 (2) of the customs act, 1962. 2. ..... , led spare parts for lighting fixtures, spare parts for lighting fixtures and capacitor for lighting fixtures covered under bill of entry no.8915658 dated 15.04.2015 in terms of section 110(2) of the customs act, 1962.) 1. ..... , led spare parts for lighting fixtures, spare parts for lighting fixtures and capacitor for lighting fixtures were imported from china on 04.04.2015 by the petitioner. ..... according to the petitioner, they sought to import led spare parts for lighting fixtures, spare parts for lighting fixtures and capacitors for lighting fixtures from m/s.zhongshan zeda lighting company limited, china. .....

Tag this Judgment!

Sep 18 2013 (HC)

N.Mohamed Kani Vs. Secretary of Tamil Nadu Electricity Board

Court : Chennai

..... factor incentive/disincentive scheme) with connected load of motors of 3 hp and above or for using welding transformers (irrespective of their rating), the consumer shall install adequate capacitors within a period of two months and shall be liable to pay a compensation charge of ten percent of the price of electricity supplied to him for the preceding four months of consumption till such time ..... (ix) consumer meter card replacement charge (x) dishonored cheque service charge (xi) meter related charges (xii) application registration charge (3) minimum charges where applicable.5. miscellaneous charges (1) capacitor compensation charge (a) no new lt service with a connected load of motors of 3 hp and above or for using welding transformers shall be given unless capacitors of adequate ratings with isi marking are installed; (b) in the case of existing lt service connections(which are not coming under the purview of power ..... adequate capacitors are installed; and where inadequate capacitors are installed or where some of the capacitors are defective, the ten percent shall be reckoned proportionate to the extent of inadequacy or defect, as the case may be ; (c) where it is found that the capacitors installed are either inadequate or defective, the licensee shall, in addition to the levy and .....

Tag this Judgment!

May 25 2007 (TRI)

Assistant Commissioner of Income Vs. First Leasing Company of India

Court : Income Tax Appellate Tribunal ITAT Chennai

Reported in : (2008)115TTJ(Chennai)802

..... in fact, tneb has purchased the meters, circuit breakers, capacitor banks from the various suppliers and has already installed the same at various locations in tamil nadu. ..... the assets claimed to have been purchased from tneb and leased back to them were in the nature of meters, capacitor banks and outdoor circuit breakers. .....

Tag this Judgment!

Sep 08 2006 (HC)

Solaiappa Sami Modern Rice Mills Rep. by Its Proprietor R. Balakrishna ...

Court : Chennai

Reported in : (2007)1MLJ878

..... on the other hand, the tamil nadu electricity board is required to put up capacitor banks and other infrastructure services to correct the low power factor in the system. ..... to maintain such power factor at the stipulated level, a capacitor can be installed and in fact most of the petitioners had done so. .....

Tag this Judgment!

Feb 10 2015 (HC)

Lakshmi Vs. State

Court : Chennai

..... while so, on 22 october, 1998 the anti power theft squad inspected the premises and it was alleged that the petitioner was indulged in usage of unauthorised load of 23.3 h.p and the capacitor was not connected to the electric circuit. ..... as per proceedings dated 9.12.1998, the fourth respondent directed the petitioner to pay a sum of rs.25,713/- on account of non connection of capacitor.4. .....

Tag this Judgment!

Feb 03 2017 (HC)

Sriraj Steels (P) Ltd. Rep. By its Director Mr.S.Sridharan, Pondicherr ...

Court : Chennai

..... materials were stolen / theft which is not covered in the scope of policy (under section ipc 379) regarding the furnace parts claimed by the insured has not been considered since the materials like choke, capacitors, busbars, heat exchanger pump ct coil etc were stolen / theft. .....

Tag this Judgment!

May 20 2010 (HC)

Chennai Heattreaters Private Limited Rep. by Its Director R. Nagaraj V ...

Court : Chennai

..... the 'charge for electricity' mentioned in section 56(1) refers to the electricity tariff; 'any some other than a charge for electricity' referred to in section 56(1) means charges other than tariff charges such as capacitor compensation charge, excess demand charge, belated payment surcharge, additional security deposit, name transfer charge, re-connection charge, meter related charges etc. .....

Tag this Judgment!

May 20 2010 (HC)

international Bakery Products Limited Vs. the Tamil Nadu Electricity B ...

Court : Chennai

..... the 'charge for electricity' mentioned in section 56(1) refers to the electricity tariff; 'any some other than a charge for electricity' referred to in section 56(1) means charges other than tariff charges such as capacitor compensation charge, excess demand charge, belated payment surcharge, additional security deposit, name transfer charge, re-connection charge, meter related charges etc. .....

Tag this Judgment!


Save Judgments// Add Notes // Store Search Result sets // Organize Client Files //