Judgment Search Results Home > Cases Phrase: capacitor Court: appellate tribunal for electricity aptel Page 1 of about 5 results (0.049 seconds)

May 23 2007 (TRI)

North Delhi Power Ltd. Vs. Delhi Electricity Regulatory

Court : Appellate Tribunal for Electricity APTEL

Reported in : (2007)LCAPTEL193

..... on reactive energy charges.referring to the review order of november 2003 in which the commission expressed its opinion that reactive energy drawal from the grid would not be required if the discoms ensure that requisite capacitor banks are installed and kept operational, the commission has disallowed the reactive energy charges imposed by transco.39. ..... has totally disallowed the reactive energy charges imposed by the transmission company called transco.this has been done on the basis of its earlier directions that the discoms should take steps to install the capacitor banks which would reduce the requirement of drawing reactive power from the grid. ..... energy charges as mentioned earlier, the commission had directed in an earlier order that a discom should make provisions for capacitor banks and has presumed that capacitor banks would be able to completely control the requirement of reactive energy. ..... would be unjust to say that simply because the commission has once made an order, for installation of capacitor banks, it can immediately disallow all expenses towards reactive energy charges. ..... is well within the purview of the commission to advise the discoms to provide adequate capacitor banks minimizing the reactive energy withdrawal from the system. ..... the commission obviously has presumed that once the capacitor banks are in place there would be no further consumption of reactive ..... the commission therefore, had information that capacitor banks not being installed in sufficient number .....

Tag this Judgment!

Jan 11 2011 (TRI)

The Tamil Nadu Spinning Mills Association, Represented Dindigul, and O ...

Court : Appellate Tribunal for Electricity APTEL

..... due. the charge of electricity mentioned in section 56(1) refers to the electricity tariff, any sum other than a charge for electricity referred to in section 56(1) means charges other than tariff charges such as capacitor compensation charge, excess demand charge, belated payment surcharge, additional security deposit, name transfer charge, reconnection charge, meter related charges, etc mentioned in clause 4 of tamil nadu electricity supply code 2004 notified by .....

Tag this Judgment!

Dec 19 2007 (TRI)

Spencer'S Retail Ltd. Vs. Maharastra Electricity

Court : Appellate Tribunal for Electricity APTEL

..... primarily the distribution licensee has obligations to achieve energy conservation by way of reducing transmission and distribution losses; aggressive drive to control theft and pilferage; effective energy audit; reactive power compensation by installation of capacitor; separation of agriculture feeder; conversion of lt into high voltage distribution (hvd) system in theft prone areas; effective implementation of meter of all consumers and other efficiency improvement measure. .....

Tag this Judgment!

Mar 29 2006 (TRI)

DakshIn Haryana Bijli Vitran Vs. Dlf Services Ltd., Dlf Universal

Court : Appellate Tribunal for Electricity APTEL

Reported in : (2006)LCAPTEL764

..... not only this, the respondents subsequently installed capacitor banks over the land which was to be used for construction of residential accommodations. ..... 14.4.8: we direct the respondents to first shift the capacitor banks, as offered by them in their filing, to make the land available for construction of the residential buildings. .....

Tag this Judgment!

Dec 10 2008 (TRI)

M/S H.M. Steel Ltd. and Others Vs. Himachal Pradesh Electricity Regula ...

Court : Appellate Tribunal for Electricity APTEL

..... the appellant herein indicated that harmonics were being suppressed by installing capacitors on each furnace. .....

Tag this Judgment!